You cannot select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
133 lines
5.9 KiB
Markdown
133 lines
5.9 KiB
Markdown
# How to release the specification
|
|
|
|
The whole specification is now released as a single unit/artifact. This document is
|
|
the process for releasing the specification and a description of how the (public)
|
|
machinery works.
|
|
|
|
## Timeline
|
|
|
|
The spec is released each calendar quarter. The target release dates are within the
|
|
following ranges:
|
|
|
|
* Q1: January 20-27 (critically, before FOSDEM).
|
|
* Q2: May 20-27.
|
|
* Q3: August 20-27.
|
|
* Q4: November 1-15 (before recurring November conflicts, like IETF).
|
|
|
|
The SCT aims to have dates picked out by:
|
|
|
|
* Q1: January 10.
|
|
* Q2: May 1.
|
|
* Q3: August 1.
|
|
* Q4: October 15.
|
|
|
|
When a release date is picked, a [checklist](https://github.com/matrix-org/matrix-spec/issues/new?assignees=&labels=release-blocker&projects=&template=release.md&title=Matrix+1.X)
|
|
issue is created to track details of the release. Release blockers should continue to
|
|
be accepted up until 7 calendar days prior to the release date.
|
|
|
|
**Release dates are not promises.** The SCT reserves the ability to change, cancel,
|
|
postpone, etc a release for any reason. Do not rely on a release happening on a given
|
|
day until the release has actually happened & blog post published.
|
|
|
|
Once a release is scheduled, the SCT will begin planning what the next release is
|
|
expected to look like. The plan should be included in the spec release blog post,
|
|
and be ready for exeuction on spec release day. Plans are guides and not promises.
|
|
|
|
A blog post for the SCT members to review should be ready at minimum 1 week before
|
|
the target release date. 1-2 days before the release itself, the prerequisite steps
|
|
below are executed to ensure the spec release can go ahead.
|
|
|
|
## Release composition
|
|
|
|
*This section is a work in progress.*
|
|
|
|
Mentioned above, the SCT aims to have spec releases quarterly. Each quarter has a
|
|
slightly different theme to it:
|
|
|
|
* Q1: Massive feature release, if possible. This generally happens thanks to FOSDEM.
|
|
* Q2: Regular feature release, if possible.
|
|
* Q3: Momentum-continuing feature release, if possible.
|
|
* Q4: Preferably a maintenance release, but will accept features per normal.
|
|
|
|
## Prerequisites / preparation
|
|
|
|
First, can we even release the spec? This stage is mostly preparation work needed
|
|
to ensure a consistent and reliable specification.
|
|
|
|
1. Ensure `main` is committed with all the spec changes you expect to be there.
|
|
2. Review the changelog to look for typos, wording inconsistencies, or lines which
|
|
can be merged. For example, "Fix typos" and "Fix spelling" can be condensed to
|
|
"Fix various typos throughout the specification".
|
|
3. Do a quick skim to ensure changelogs reference the MSCs which brought the changes
|
|
in. They should be linked to the GitHub MSC PR (not the markdown document).
|
|
|
|
## The release
|
|
|
|
Assuming the preparation work is complete, all that remains is the actual specification
|
|
release.
|
|
|
|
1. Create a `release/v1.2` branch where `v1.2` is the version you're about to release.
|
|
2. Update the `params.version` section of `config.toml` to use the following template:
|
|
```toml
|
|
[params.version]
|
|
status = "stable"
|
|
current_version_url = "https://spec.matrix.org/latest"
|
|
|
|
# This will be the spec version you're releasing. If that's v1.2, then `major = "1"`
|
|
# and `minor = "2"`
|
|
major = "1"
|
|
minor = "2"
|
|
|
|
# Today's date. Please use the format implied here for consistency.
|
|
release_date = "October 01, 2021"
|
|
```
|
|
3. Commit the changes.
|
|
4. Generate the changelog.
|
|
1. Activate your python virtual environment.
|
|
2. Run `./scripts/generate-changelog.sh v1.2 "October 01, 2021"` (using the correct
|
|
version number and same `release_date` format from the hugo config).
|
|
3. Commit the result.
|
|
5. Tag the branch with the spec release with a format of `v1.2` (if releasing Matrix 1.2).
|
|
6. Push the release branch and the tag.
|
|
7. GitHub Actions will run its build steps. Wait until these are successful. If fixes
|
|
need to be made to repair the pipeline or spec build, delete and re-tag the release.
|
|
You may need to fix up the changelog file by hand in this case.
|
|
8. Check out and fast-forward `main` to the release branch.
|
|
9. Create a new release on GitHub from the newly created tag.
|
|
* The title should be just "v1.2" (for example).
|
|
* The description should be a copy/paste of the changelog. The generated changelog
|
|
will be at `content/changelog/v1.2.md` - copy/paste verbatim.
|
|
* Upload the artifacts of the GitHub Actions build for the release to the GitHub
|
|
release as artifacts themselves. This should be the tarball that will be deployed
|
|
to spec.matrix.org.
|
|
10. Commit a reversion to `params.version` of `config.toml` on `main`:
|
|
```toml
|
|
[params.version]
|
|
status = "unstable"
|
|
current_version_url = "https://spec.matrix.org/latest"
|
|
# major = "1"
|
|
# minor = "2"
|
|
# release_date = "October 01, 2021"
|
|
```
|
|
11. Push pending commits and ensure the unstable spec updates accordingly from the
|
|
GitHub Actions pipeline.
|
|
12. Deploy the release on the webserver. See internal wiki.
|
|
|
|
## Patching a release
|
|
|
|
From time to time we'll need to update a release in the wild. Examples include fixing typos,
|
|
updating build machinery, etc. Typically it is not considered a good idea to patch a release
|
|
more than 1 month after the original release date - this is because the administrative effort
|
|
is typically best reserved for the next release cycle.
|
|
|
|
**Patch releases are not to be used for spec changes. Only typos and equivalent.**
|
|
|
|
1. Add the required changes to the release branch (`release/v1.2` for example).
|
|
2. Fast forward the `v1.2` tag to the release branch head.
|
|
3. Push both the release branch and fast-forwarded tag.
|
|
4. Wait for the GitHub Actions build to complete on the tag.
|
|
5. Update the assets on the GitHub release to those generated by the latest Actions build.
|
|
6. Deploy the release on the webserver. See internal wiki.
|
|
7. Remove the changelog entries from `main`, if the changes landed on `main`.
|
|
8. Update the github release changelog and changelog on `main`, likely by hand.
|