@ -7,7 +7,7 @@ which apply:
2. Individual endpoint versioning underneath an API spec document version (`/v1/`, `/v2/`, etc). Note 2. Individual endpoint versioning underneath an API spec document version (`/v1/`, `/v2/`, etc). Note
that the client-server API currently ties the major version of its spec document version to the that the client-server API currently ties the major version of its spec document version to the
endpoint, thus making most endpoints under it as `/r0/` (currently). endpoint, thus making most endpoints under it as `/r0/` (currently).
3. Room versions to freezing a set of behaviour and algorithms on a per-room basis. These are well 3. Room versions which define a set of behaviour and algorithms on a per-room basis. These are well
defined in the spec and are not covered here: https://matrix.org/docs/spec/#room-versions defined in the spec and are not covered here: https://matrix.org/docs/spec/#room-versions
4. An overarching "Matrix" version, largely for marketing purposes. So far we've only cut Matrix 1.0 4. An overarching "Matrix" version, largely for marketing purposes. So far we've only cut Matrix 1.0
back when we finalized the initial versions of the spec documents, but have not cut another one back when we finalized the initial versions of the spec documents, but have not cut another one
@ -29,9 +29,9 @@ it currently), the APIs, room versions, and the appendices (which are also curre
contain specification). Room versions are a bit more nuanced though, and are covered later in this MSC. contain specification). Room versions are a bit more nuanced though, and are covered later in this MSC.
The version which covers the entire specification and all its parts is called the "Matrix version", and The version which covers the entire specification and all its parts is called the "Matrix version", and
is a promotion of the previously marketing-only version number assigned to the spec. Upon acceptance of is a promotion of the previously marketing-only version number assigned to the spec. The spec core team
this MSC, the Matrix version would be 1.1.0. v1.0 from the marketing era would be recorded somewhere for is expected to release Matrix 1.1.0 as the first version, leaving v1.0 as the marketing era and recorded
posterity, though largely has no significant meaning (unchanged by this MSC). somewhere for posterity (though has no significant meaning, unchanged by this MSC).
Doing this has the benefits previously alluded to: Doing this has the benefits previously alluded to:
@ -66,10 +66,10 @@ Given a version number `MAJOR.MINOR.PATCH`, incremement the:
When present in the protocol itself, the Matrix version will always be prefixed with `v`. For example, When present in the protocol itself, the Matrix version will always be prefixed with `v`. For example,
`v1.1.0`. `v1.1.0`.
When a dash (`-`) is present after the `PATCH` version, the version is denoting some off-cycle release Additional information can be supplied in the version number by appending a dash (`-`) to the end of the
information. This is how we'd, for example, make release candidates, alpha, beta, or unstable builds as version and including any relevant information. This is typically used to denote alpha, beta, unstable,
needed. This MSC does not propose a scheme for RCs or pre-releases, though the Spec Core Team may wish or other similar off-cycle release builds. This MSC does not propose a scheme for RCs or pre-releases,
to do so. though the Spec Core Team may wish to do so.
See the section on brewing Matrix versions for information on how the unstable version is decided. See the section on brewing Matrix versions for information on how the unstable version is decided.
@ -158,7 +158,7 @@ the Spec Core Team be able to blindside the community with a release for no just
To recap, the process is as follows: To recap, the process is as follows:
1. Sometime after a given release happens, the Spec Core Team announces a cutoff date for MSCs to land 1. Sometime before a given release happens, the Spec Core Team announces a cutoff date for MSCs to land
that is at least 2 months in the future. that is at least 2 months in the future.
2. Upon cutoff, the Spec Core Team takes responsibility for ensuring all relevant changes are written 2. Upon cutoff, the Spec Core Team takes responsibility for ensuring all relevant changes are written