Commit Graph

17 Commits (fee74e7ea7fd489456251d916a65b62cd32c83b0)

Author SHA1 Message Date
Brad Fitzpatrick 1e7a35b225 types/netmap: split controlclient.NetworkMap off into its own leaf package
Updates #1278

Signed-off-by: Brad Fitzpatrick <bradfitz@tailscale.com>
4 years ago
Denton Gentry 02c34881b5 Add more tests for Direct.
Signed-off-by: Denton Gentry <dgentry@tailscale.com>
4 years ago
Brad Fitzpatrick 696020227c tailcfg, control/controlclient: support delta-encoded netmaps
Should greatly reduce bandwidth for large networks (including our
hello.ipn.dev node).

Signed-off-by: Brad Fitzpatrick <bradfitz@tailscale.com>
4 years ago
David Anderson 7317e73bf4 control/controlclient: move direct_test back to corp repo.
It can only be built with corp deps anyway, and having it split
from the control code makes our lives harder.

Signed-off-by: David Anderson <danderson@tailscale.com>
5 years ago
Avery Pennarun c5fcc38bf1 controlclient tests: fix more memory leaks and add resource checking.
I can now run these tests with -count=1000 without running out of RAM.

Signed-off-by: Avery Pennarun <apenwarr@tailscale.com>
5 years ago
Avery Pennarun a7edf11a40 {ipn,control/controlclient}/tests: pass a logf function to control.New().
This matches the new API requirements.

Signed-off-by: Avery Pennarun <apenwarr@tailscale.com>
5 years ago
Avery Pennarun 108237798d controlclient and ipn tests: supply --advertise-tags and --advertise-routes.
This helps validate the server's behaviour when these are present.
5 years ago
David Crawshaw d2b7cb1e45 ipn, controlclient: add control.New parameter
Signed-off-by: David Crawshaw <crawshaw@tailscale.com>
5 years ago
David Anderson 66c7875974 control/controlclient: wait for c1 to receive a netmap.
This strictly sequences things such that c1 is fully registered in
the control server before c2 creates its poll. Failure to do this
can cause an inversion where c2's poll finishes establishing
before c1's poll starts, which results in c2 getting disconnected
rather than c1, and the test times out waiting for c1 to get kicked.

Fixes #98.

Signed-off-by: David Anderson <danderson@tailscale.com>
5 years ago
David Anderson cbb1e2e853 control/controlclient: document test TestClientsReusingKeys.
The test is straightforward, but it's a little perplexing if you're
not overly familiar with controlclient.

Signed-off-by: David Anderson <danderson@tailscale.com>
5 years ago
Brad Fitzpatrick 95a658e1e3 control/controlclient: also rename HTTPC in the tests 5 years ago
David Crawshaw 0590ad68be controlclient, ipn: adjust tests for authURL semantic changes
The tests cheat at filling out web forms by directly POSTing to
the target. The target for authURLs has changed slightly, the base
authURL now redirects the user to the login page.

Additionally, the authURL cycle now checks the cookie is set
correctly, so we add cookie jars where necessary to pass the
cookie through.
5 years ago
David Crawshaw 5a0822eefd controlclient, ipn: fix tests for new control param 5 years ago
Brad Fitzpatrick 758744a4e3 Fix some Hostinfo value usages from the previous commit. 5 years ago
Shawn Smith 1ca83fd205 fix typos
Signed-off-by: Shawn Smith <shawnpsmith@gmail.com>
5 years ago
David Crawshaw 33dfb8999e controlclient, ipn: update tests for key pointer change
Signed-off-by: David Crawshaw <crawshaw@tailscale.com>
5 years ago
Earl Lee a8d8b8719a Move Linux client & common packages into a public repo. 5 years ago