Commit Graph

58 Commits (4c2e978f1e29b530f8b0a05f007c87eb4b2de8cb)

Author SHA1 Message Date
Christine Dodrill e1b994f7ed
tstest/integration/vms: maintain distro info (#2020)
This lets us see the names of distros in our tests.

Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago
Brad Fitzpatrick fa548c5b96
tstest/integration/vms: fix bindhost lookup (#2012)
Don't try to do heuristics on the name. Use the net/interfaces package
which we already have to do this sort of stuff.

Fixes #2011

Signed-off-by: Brad Fitzpatrick <bradfitz@tailscale.com>
4 years ago
Christine Dodrill 14c1113d2b
tstest/integration/vms: copy locally built binaries (#2006)
Instead of pulling packages from pkgs.tailscale.com, we should use the
tailscale binaries that are local to this git commit. This exposes a bit
of the integration testing stack in order to copy the binaries
correctly.

This commit also bumps our version of github.com/pkg/sftp to the latest
commit.

If you run into trouble with yaml, be sure to check out the
commented-out alpine linux image complete with instructions on how to
use it.

Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago
Brad Fitzpatrick f21982f854 tstest/integration/vms: skip a test for now
Updates #2011

Signed-off-by: Brad Fitzpatrick <bradfitz@tailscale.com>
4 years ago
Christine Dodrill 4cfaf489ac
tstest/integration/vms: t.Log for VM output (#2007)
Previously we spewed a lot of output to stdout and stderr, even when
`-v` wasn't set. This is sub-optimal for various reasons. This patch
shunts that output to test logs so it only shows up when `-v` is set.

Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago
Christine Dodrill 1f72b6f812
tstest/integration/vms: use dynamically discovered bindhost (#1992)
Instead of relying on a libvirtd bridge address that you probably won't
have on your system.

Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago
Christine Dodrill 35749ec297
tstest/integration/vms: small cleanups (#1989)
Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago
Christine Dodrill ba59c0391b
tstest/integration: add experimental integration test (#1966)
This will spin up a few vms and then try and make them connect to a
testcontrol server.

Updates #1988

Signed-off-by: Christine Dodrill <xe@tailscale.com>
4 years ago