Update and clarify proposal labels

pull/977/head
Andrew Morgan 6 years ago
parent 2b259c6a7b
commit f8ffa79b56

@ -96,7 +96,7 @@ follows:
<https://github.com/matrix-org/matrix-doc/issues>`_ to give context
for the proposal.
- Additionally, please be sure to sign off your proposal PR as per the
guidelines at `CONTRIBUTING.rst
guidelines listed on `CONTRIBUTING.rst
<https://github.com/matrix-org/matrix-doc/blob/master/CONTRIBUTING.rst>`_.
- Gather feedback as widely as possible.
@ -157,7 +157,7 @@ follows:
assume old information wasn't merged into the spec.
- Similar to the proposal PR, please sign off the spec PR as per the
guidelines at `CONTRIBUTING.rst
guidelines on `CONTRIBUTING.rst
<https://github.com/matrix-org/matrix-doc/blob/master/CONTRIBUTING.rst>`_.
- Your PR will then be reviewed and hopefully merged on the grounds it is
@ -215,15 +215,17 @@ labels for each stage on the `matrix-doc
Lifetime States
---------------
**Note:** All labels are to be placed on the proposal PR.
=============================== ============================= ====================================
Name GitHub Label Description
=============================== ============================= ====================================
Proposal Drafting and Feedback N/A A proposal document which is still work-in-progress but is being shared to incorporate feedback
Proposal In Review proposal-in-review A proposal document which is now ready and waiting for review by the Core Team and community
Proposal Final Comment Period proposal-final-comment-period A proposal document which has reached final comment period either for merge, closure or postponement
Proposal Merged/Spec PR Missing proposal-passed-review A proposal document which has passed review. Waiting for a PR against the Spec
Spec PR In Review spec-pr A proposal that has been PR'd against the spec and is currently under review
Spec PR Merged merged (on proposal pr) A proposal with a sufficient working implementation and whose Spec PR has been merged!
Proposal Merged/Spec PR Missing spec-pr-missing A proposal document which has passed review. Waiting for a PR against the Spec
Spec PR In Review spec-pr-in-review A proposal that has been PR'd against the spec and is currently under review
Spec PR Merged merged A proposal with a sufficient working implementation and whose Spec PR has been merged!
Postponed proposal-postponed A proposal that is temporarily blocked or a feature that may not be useful currently but perhaps
sometime in the future
Closed proposal-closed A proposal which has been reviewed and deemed unsuitable for acceptance

Loading…
Cancel
Save